All races
Cycling

Dreiländergiro Nauders

Dreiländergiro Nauders takes place on Sun, Jun 27, 2027 in Nauders, Austria. The main route is 168 km.

Date
Sun, Jun 27, 2027
Start
Nauders 🇦🇹
Distance
168 km
Climbing
3,300 m
Level
Open to all
Add race day to your calendar

The Dreiländergiro is a popular European alpine cycling marathon starting and finishing in Nauders, featuring challenging routes across three countries and over 3,000 vertical meters with an ascent of the Stelvio Pass.

Official event page

What this race demands

This alpine cycling marathon demands exceptional climbing endurance and high-altitude pacing to manage 3,300 meters of elevation gain over 168 kilometers.

Climbing Volume

Over 3,300 meters of vertical gain distributed across a 168-kilometer route requires sustained climbing strength and efficient energy management on long alpine ascents.

High-Altitude Endurance

Ascending the Stelvio Pass demands strong aerobic capacity and the ability to sustain effort at high altitudes where oxygen availability is reduced.

Muscular Durability

A continuous alpine profile requires persistent muscular engagement on climbs and technical focus during descents over a lengthy duration.

Target 60 to 90 grams of carbohydrates per hour to maintain energy output throughout the extended duration of the alpine marathon.

What would it take you?

Pick the level closest to yours for an estimate of finish time on this course and the training a solid preparation needs.

Estimated finish

7:559:30

Peak-week training

6–8 h/week

A model estimate from distance, climbing and level, not a promise. Conditions, drafting and pacing move it.

IntervalCoach turns those weekly hours into a concrete plan built around your actual fitness. Start with this race as your goal

Your road to race day

Race day at Dreiländergiro Nauders is 44 weeks away. This is how a coach divides that time. The first phase starts now.

  1. 01Base32 weeks · Aug 24, 2026 Apr 4, 2027

    Aerobic foundation: mostly steady endurance work that grows the aerobic engine and the durability the later phases stand on.

  2. 02Build6 weeks · Apr 5, 2027 May 16, 2027

    Progressive overload: training load climbs in waves, with harder weeks stacked on the base and planned recovery weeks that let the gains land.

  3. 03Peak3 weeks · May 17, 2027 Jun 6, 2027

    The hardest weeks of the plan: race-specific intensity at nearly full training load, sharpening exactly what this race asks for.

  4. 04Taper2 weeks · Jun 7, 2027 Jun 20, 2027

    Volume drops while intensity stays: short, sharp efforts keep the legs awake as fatigue drains away.

  5. 05Race week1 week · Jun 21, 2027 Jun 27, 2027

    Openers, rest and logistics. The work is done; the job now is arriving fresh.

Get this plan built around your own fitness

Similar races

Organising this race?